ACC was awarded the NGL Pipeline Pumps & Allied Works at Asab-0 Project.
Site preparation, design, construction and supply of civil, structural and architectural works at the Beaat 2 Facility.
The Fujairah F2 Plant is a Greenfield power generation and seawater desalination plant with 2,000 MW of net power capacity and 130 MIGD of net water capacity.
The Ruwais 4th NGL Train Project was a project by Abu Dhabi National Oil Company (ADNOC) ...
The Shuweihat S1 1500 MW combined cycle power plant is currently one of the world's largest combined ...
ACC was the civil works and structural steel contractor on this 750MW power plant, completed in August 2001 ...