Presidential Palace Abu Dhabi Marine Works

The Ministry of Presidential Affairs Abu Dhabi (MOPA) are constructing a new presidential palace to replace the existing one in the Ras Al Akhdar peninsula of Abu Dhabi.

ACC carried out works to realign the existing shore by constructing a reinforced concrete seawall of approximately 1.65km long. This included enabling works; seawall construction; demolishing existing groynes and constructing new groynes and revetment; constructing reinforced beach steps, guard tower raft foundations and walls and constructing new beaches.