Emirates Steel Factory Integration Project Abu Dhabi

By Subhi Kussad,

To enable the import of the iron ore, a jetty has been constructed in the Mussafah Channel where the ore material will be discharged from barges into a hopper and on to a conveyor system leading to the plant.

The Jetty Construction package included the construction of a 60m long blockwork quay wall including fenders and bollards; construction of blockwork mooring and breasting dolphins; dredging of 180,000m³ for navigation and berthing of barges; fabrication and erection of 200m long structural steel catwalk; construction of bored piled hopper foundations; supply and installation of a 30m high light mast; construction of rock revetment and pavement.