Fujairah F1 Reverse Osmosis Plant Extension, Fujairah

By ,

ACC delivered the civil and structural works on the Reverse Osmosis Plant Extension Project in Fujairah, UAE.

The Project comprises the detailed design, procurement and construction of Civil & Structural works of Reverse Osmosis Extension Plant facilities on unused land that forms part of the existing F1 Plant. The scope also included ACC laying the GRP pipeline network including steel supports installation.

  Category:
  Comments: Comments Off on Fujairah F1 Reverse Osmosis Plant Extension, Fujairah

Central Environmental Protection Facility Beaat 2, Abu Dhabi

By ,

The purpose of the Beaat 2 facility is to safely retrieve, manage, treat and dispose of hazardous waste at the Ruwais Refinery in Abu Dhabi Emirate, and ensure that human health and the environment are adequately protected.

ACC’s scope of work for this project included site preparation, design, construction and supply of civil, structural and architectural works.

It also involved supply, installation and testing of piping systems, assembly and installation of mechanical equipment, supply and installation of tank works & equipment and piping insulation.

  Category:
  Comments: Comments Off on Central Environmental Protection Facility Beaat 2, Abu Dhabi

Emirates Steel Factory Integration Project Abu Dhabi

By Subhi Kussad,

Emirates Steel Industries has established a steel plant in the Industrial City of Mussafah in the Emirate of Abu Dhabi to produce 1.4 million tonnes per year of steel billets.

To enable the import of the iron ore, a jetty has been constructed in the Mussafah Channel where the ore material will be discharged from barges into a hopper and onto a conveyor system leading to the plant.

The Jetty Construction package included the construction of a 60 m long blockwork quay wall including fenders and bollards; construction of blockwork mooring and breasting dolphins; dredging of 180,000 m³ for navigation and berthing of barges; fabrication and erection of a 200 m long structural steel catwalk; construction of bored piled hopper foundations; supply and installation of a 30 m high light mast and the construction of rock revetment and pavement.

  Category:
  Comments: Comments Off on Emirates Steel Factory Integration Project Abu Dhabi